Rio Tinto invests in electric underground mine at Kennecott 1International Copper Equipment & Technology Mining technology 

Rio Tinto invests in electric underground mine at Kennecott

Rio Tinto is investing in its Kennecott operation near Salt Lake City, Utah, to strengthen its supply of copper in the US by increasing production from underground mining and improving the health of key assets.

$498 million of funding has been approved to deliver underground development and infrastructure for an area known as the North Rim Skarn (NRS). Production from the NRS will commence in 2024 and is expected to ramp up over two years, to deliver around 250,000 t of additional mined copper over the next 10 years alongside open pit operations.

The global miner added: “As the above production target is in part underpinned by Inferred Resources, we note in accordance with ASX Listing Rule 5.16.4 that there is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised.”

In September 2022, Rio Tinto approved development capital totalling $55 million to start underground mining in an area known as the Lower Commercial Skarn (LCS). Underground production within LCS started in February 2023, and is expected to deliver a total of around 30 thousand tonnes of additional mined copper through the period to 2027.

These two investments will support Kennecott in building a world class underground mine which will leverage battery electric vehicle (BEV) technology, following a successful trial with Sandvik Mining & Rock Solutions equipment in 2022 (LH518B loader and Z50 truck).

Rio Tinto states: “BEV’s create a safer and healthier workplace for employees underground, increase the productivity of the mine and reduce emissions from operations.”

A $300 million rebuild is also underway at the Kennecott smelter. The rebuild is the largest in Kennecott’s history and commenced in May 2023. A further $120 million is being invested to upgrade the refinery tank house structure and update Kennecott’s molybdenum flotation circuit with a state-of-the art, fully automated system.

As the second largest copper producer in the US, this will allow Kennecott to continue ​to deliver a high quality product to customers.

Rio Tinto Copper chief operating officer Clayton Walker said: “We are investing to build a world class underground mine at Kennecott and strengthen our processing facilities, to meet the growing demand for copper in the United States, a key material for domestic manufacturing and the energy transition.

This investment will position Kennecott to continue the strong contribution it has made as part of the Salt Lake Valley community for 120 years, injecting about $1.5 billion annually to the local Utah economy.”

Studies to inform decisions on the next phases of expanding underground production continue in parallel with work that is being advanced to extend open pit mining at Kennecott beyond 2032.

All the above investments are already included in Rio Tinto’s share of capital investment guidance for 2023 to 2025.

The NRS has updated Indicated Mineral Resources of 10.8 Mt at 2.93 % copper, 1.20 g/t gold, 65.97 g/t silver, 0.008 % molybdenum, and Inferred Mineral Resources of 7.7 Mt at 3.13 % copper, 0.96 g/t gold, 18.41 g/t silver, and 0.005 % molybdenum identified based on additional drilling and an initial Probable Ore Reserve of 3.0 Mt at 2.39 % copper, 1.77 g/t gold, 18.59 g/t silver, and 0.010 % molybdenum. Mineral Resources and Ore Reserves are quoted on a 100% basis.

Loading

Share this article on

Related posts

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

Copperbelt Katanga Mining will use the information you provide on this form to be in touch with you and to provide updates and marketing.