TANTALEX LITHIUM RESOURCES CONFIRMS AVERAGE 0,946% LI2O GRADE FROM THE FINAL 115 DRILLHOLES ON MANONO TAILINGS
Tantalex Lithium Resources Corp. (CSE: TTX – FSE: DW8 – OTCQB: TTLXF) (“Tantalex” or the “Corporation”), is pleased to announce that the final assay results received from it’s 2022 infill drilling program on the K dump has returned an average grade 0,946% Li2O from surface.
Manono Tailings – K Dump
A total of 2117 metres from 156 aircore drillholes has been completed on nominal 50m centres to define a measured category for the Mineral Resource Estimate currently underway. On September 6th, we announced the results of the assays received from the first 41 drillholes (red dots in Fig.1).
Figure 1 below demonstrates the location of the results received from the latest 115 drillholes.
Figure 1: K dump drillhole locations –drill holes MDA211 to MDA 325 (in yellow)
The K dump is composed of two different sections; 1) a steeply stacked section to the northeast that varies from 47m to 21m thick with an average thickness of 38m, and 2) a gently domed 500m x 600m terrace section with an average thickness of 11m with depths generally 15m to 20m in the centre shallowing to 3-5m at the edges.
In drill holes MDA211 to MDA 325 a total of 22 holes were drilled to more than 15 metres depth. All 22 holes deeper than 15m returned mineralisation from the surface (Table 1).
TABLE 1. Assay intersections from MDA211 to MDA325 greater than 15 metres depth.
Table 1: Dill hole intercepts for drillholes of minimum 15m depth
Figure 2 shows a typical section through the course stacked dumps showing the vertical and lateral continuity of the lithium grades.
Figure 2. Coarse stacked dump MDA175 – 181 100m cross section.
Figure 3 shows a typical 200 metre section across the domed terrace showing the lateral and vertical continuity of the lithium grades.
Figure 3. Typical cross section across centre of terrace dome.
“Having the entire K dump in the measured category for our Maiden Mineral Resource Estimate (MRE) will provide the robustness required to proceed rapidly with our Preliminary Economic Assessment.” said Eric Allard, CEO of Tantalex. “Assay results from the G dump are forthcoming and once received we will be able to complete and issue our MRE expected for early October now.”