Zambia Faces 2.1 Million-Tonne Copper Production Gap Ahead of 2031 Target 1Mining in Zambia Copper Economy 

Zambia Faces 2.1 Million-Tonne Copper Production Gap Ahead of 2031 Target

Zambia Copper Production Outlook for Kansanshi, Lumwana, Mopani and Mingomba

Zambia needs to increase annual copper production by about 2.1 million tonnes from its 2025 level to meet the government’s target of three million tonnes by 2031.

 Expansion projects at existing mines could lift output before the deadline, while one of the country’s largest new copper projects is targeting first production in the early 2030s.

Mines and Minerals Development Minister Brenda Tambatamba reaffirmed the target at an industry breakfast meeting in Lusaka on 17 November.

Zambia produced 890,346 tonnes of copper in 2025, up nearly 8% from 825,513 tonnes in 2024, according to the Zambia Revenue Authority. Reaching the target would require annual output to grow to almost 3.4 times its 2025 level.

Existing mines offer the earliest gains

At Kansanshi in Solwezi, First Quantum Minerals expects to produce 175,000 to 185,000 tonnes of copper in 2026, rising to 230,000 to 260,000 tonnes in 2028 as its S3 expansion ramps up. S3 reached commercial production in the fourth quarter of 2025.

Barrick is targeting first copper from the Lumwana Super Pit expansion by the end of the first quarter of 2028.

The expansion is designed to lift annual copper production to about 240,000 tonnes over a mine life of more than 30 years.

On the Copperbelt, Mopani Copper Mines is targeting 300,000 tonnes of finished copper annually by 2029, with majority shareholder International Resources Holding reaffirming its US$1.1 billion funding commitment in October.

In Chingola, Konkola Copper Mines signed a US$498 million contract with China NERIN in September for a plant designed to recover up to 70,000 tonnes of copper annually from existing tailings.

Mingomba’s timeline puts the focus on delivery

KoBold Metals is targeting around 300,000 tonnes of copper a year from Mingomba in Chililabombwe.

The company expects first output in the early 2030s, leaving the volume Mingomba could contribute in 2031 uncertain.

Reliable electricity is also a constraint. Zambia’s Metals and Minerals Country Compact identifies reliable and affordable power as one of the main barriers to mining expansion.

 As operators bring new processing capacity online, the pace of mine ramp-ups and the availability of power will help determine how much additional copper Zambia can produce by 2031.

Loading

Share this article on

Related posts

Leave a Comment

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

Copperbelt Katanga Mining will use the information you provide on this form to be in touch with you and to provide updates and marketing.